Archive for the ‘Plant Construction’ Category

Update – July 14

Wednesday, July 14th, 2010

Our first rail cars of feed stock arrived today!!    After unloading, the feedstock will be used to begin commissioning the plant.

Picture 070-1

July 10, 2010 Update!!

Saturday, July 10th, 2010

All plant systems have been turned over to our Operations and Maintenance groups from the Project Team for commissioning and start up. We are in the commissioning process, including the flushing of lines, confirming control system functionality, inventorying the systems, and loading absorbents and catalysts. Here are some recent pictures from the plant.

Heat Exchanger Piping Insulation Being Insulated.

Loading the absorber system.

Heat Exchanger Piping Insulation Being Insulated.

Hot oil system is being commissioned.

Heat Exchanger Piping Insulation Being Insulated.

Hydrogen compression construction completed.

Heat Exchanger Piping Insulation Being Insulated.

Process heat exchangers getting final insulation installed.

Heat Exchanger Piping Insulation Being Insulated.

Reactor area looks better with all the scaffold removed.

Heat Exchanger Piping Insulation Being Insulated.

Fractionation towers ready to go to work.

Project Update – May 8, 2010

Sunday, May 9th, 2010
Truck Loading Area Being Graded.

Our Sign!!

Treated and Raw Feed Storage Tanks.

Treated and Raw Feed Storage Tanks.

Rail Unloading Area.

Truck Feedstock Unloading.

Pipe Rack Getting Pretty Full And Other Piping Being Insulated.

Sour Water Desulfurizers.

Core Reactor Area Progressing.

Rail Feedstock Offloading.

Looking Toward The Plant From Out By The Flare Area.

Off Spec Storage Tank (Left) Naphtha Storage (Right).

Truck Loading Area Being Graded.

Off Gas Compressor 300 HP.

Truck Loading Area Being Graded.

LPG Storage Bullet 90,000 Gallon Capacity.

Truck Loading Area Being Graded.

Hydrogen Compressor 2800 HP.

Truck Loading Area Being Graded.

Light Ends Fractionation Towers.

Truck Loading Area Being Graded.

HI Reactor (Left) Product Fractionator (Right).

Truck Loading Area Being Graded.

Hot Oil Heater.

Truck Loading Area Being Graded.

HI Feed Stripper.

Truck Loading Area Being Graded.

HDO Reactors.

Truck Loading Area Being Graded.

HDO Cold Separator.

Truck Loading Area Being Graded.

HDO Hot Separator.

Truck Loading Area Being Graded.

HDO Charge Pump 450 HP.

Truck Loading Area Being Graded.

HDO Charge Drum.

Truck Loading Area Being Graded.

Feed Treatment.

Truck Loading Area Being Graded.

The Flare.

Construction Update – April 6, 2010

Monday, April 12th, 2010

Weather has been warm and dry, “Good” construction weather.

Heat Exchanger Piping Insulation Being Insulated.

Heat Exchanger Piping Insulation Being Insulated.

Rail Unloading Area.

Rail Unloading Area.

Pipe Rack Getting Pretty Full And Other Piping Being Insulated.

Pipe Rack Getting Pretty Full And Other Piping Being Insulated.

Core Reactor Area Progressing.

Core Reactor Area Progressing.

Looking Toward The Plant From Out By The Flare Area.

Looking Toward The Plant From Out By The Flare Area.

Truck Loading Area Being Graded.

Truck Loading Area Being Graded.

Construction Update – March 8, 2010

Monday, March 8th, 2010

Construction crews worked through the weekend to take advantage of the cool dry days.

Truck Loading Station for Products.

Feed reception and storage tanks.

Truck Loading Station for Products.

Tarps are used to block the wind for welders installing pipe.

Truck Loading Station for Products.

North Process Area

Truck Loading Station for Products.

West Process Area

Truck Loading Station for Products.

South Process Area

Truck Loading Station for Products.

North Process Area.

Truck Loading Station for Products.

Truck Loading Station for Products.