Project Update – May 8, 2010

Truck Loading Area Being Graded.

Our Sign!!

Treated and Raw Feed Storage Tanks.

Treated and Raw Feed Storage Tanks.

Rail Unloading Area.

Truck Feedstock Unloading.

Pipe Rack Getting Pretty Full And Other Piping Being Insulated.

Sour Water Desulfurizers.

Core Reactor Area Progressing.

Rail Feedstock Offloading.

Looking Toward The Plant From Out By The Flare Area.

Off Spec Storage Tank (Left) Naphtha Storage (Right).

Truck Loading Area Being Graded.

Off Gas Compressor 300 HP.

Truck Loading Area Being Graded.

LPG Storage Bullet 90,000 Gallon Capacity.

Truck Loading Area Being Graded.

Hydrogen Compressor 2800 HP.

Truck Loading Area Being Graded.

Light Ends Fractionation Towers.

Truck Loading Area Being Graded.

HI Reactor (Left) Product Fractionator (Right).

Truck Loading Area Being Graded.

Hot Oil Heater.

Truck Loading Area Being Graded.

HI Feed Stripper.

Truck Loading Area Being Graded.

HDO Reactors.

Truck Loading Area Being Graded.

HDO Cold Separator.

Truck Loading Area Being Graded.

HDO Hot Separator.

Truck Loading Area Being Graded.

HDO Charge Pump 450 HP.

Truck Loading Area Being Graded.

HDO Charge Drum.

Truck Loading Area Being Graded.

Feed Treatment.

Truck Loading Area Being Graded.

The Flare.