Construction Update – December 4, 2009

Diesel tank.

Diesel tank.

Some of the last pieces of equipment to arrive.

Some of the last pieces of equipment to arrive.

The truck loading rack under construction.

The truck loading rack under construction.

The LPG bullet and piping.

The LPG bullet and piping.

Installing insulation on the de-ethanizer.

Installing insulation on the de-ethanizer.

Concrete work for the truck scale.

Concrete work for the truck scale.

Raw material tanks.

Raw material tanks.